Our Portfolio

Completed Projects

Explore our portfolio of 500+ successfully completed projects across HVAC, power, construction, and industrial sectors.

510 MVA Transformer Unloading & Foundation Shifting
Power & ElectricalBurdwan, West Bengal

510 MVA Transformer Unloading & Foundation Shifting

Unloading and precision shifting of a 510 MVA power transformer to its foundation pad at Satgachi sub-station, Burdwan. One of the heaviest single-piece lifts handled by IPN LIFTERS.

Client: Larsen & Toubro

View Case Study
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam
HVAC/MEPJagiroad, Morigaon, Assam

Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam

Unloading, shifting and positioning of Johnson Controls YORK chiller units and DOL starter panels at India's first OSAT semiconductor assembly and test facility, executed under TATA Projects' site management.

Client: Johnson Controls India / TATA Projects

View Case Study
Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam
HVAC/MEPAssam

Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam

Unloading and shifting of a Johnson Controls 2700 TR water-cooled chiller at TATA Projects' semiconductor facility in Assam.

Client: TATA Projects / Johnson Controls

View Case Study
Chiller Lifting to 45m Height — Peerless Hospital
HVAC/MEPKolkata, West Bengal

Chiller Lifting to 45m Height — Peerless Hospital

Lifting and shifting a chiller machine to the rooftop of Peerless Hospital at 45 metres height with a 20-metre crane radius — one of the most challenging lifts in a hospital environment.

Client: Peerless Hospital

View Case Study
900 TR Centrifugal Chiller — MPIN Solar Project
HVAC/MEPEastern India

900 TR Centrifugal Chiller — MPIN Solar Project

Unloading and shifting of a massive 900 TR water-cooled centrifugal chiller by Trane Technologies for the MPIN Solar project — one of the largest single chiller units handled by IPN LIFTERS.

Client: MPIN Solar / Trane Technologies

View Case Study
210 MVA Transformer — NTPC Farakka
Power & ElectricalFarakka, West Bengal

210 MVA Transformer — NTPC Farakka

Unloading, dragging, and shifting a 210 MVA power transformer to its foundation at NTPC's Farakka thermal power station.

Client: NTPC Limited

View Case Study
50 MVA Transformer Unloading — L&T Jharkhand
Power & ElectricalJharkhand

50 MVA Transformer Unloading — L&T Jharkhand

Unloading and positioning of a 50 MVA power transformer at a new sub-station facility in Jharkhand, executed under L&T's project management.

Client: Larsen & Toubro

View Case Study
Transformer Shifting — Skipper Limited
Power & ElectricalKolkata, West Bengal

Transformer Shifting — Skipper Limited

Internal shifting and repositioning of power transformers at Skipper Limited's Kolkata facility as part of a plant layout reconfiguration.

Client: Skipper Limited

View Case Study
Toshiba Transformer Handling — Kolkata
Power & ElectricalKolkata, West Bengal

Toshiba Transformer Handling — Kolkata

Precision handling and positioning of a Toshiba power transformer at a Kolkata substation project.

Client: Toshiba

View Case Study
450 TR Chiller Dismantling & Reinstallation — RDB Project
HVAC/MEPKolkata, West Bengal

450 TR Chiller Dismantling & Reinstallation — RDB Project

Complete dismantling and reinstallation of a 450 TR chiller machine at an RDB Group commercial project in Kolkata.

Client: RDB Group

View Case Study
450 TR Chiller Dismantling & Reinstallation — Peerless Hospital
HVAC/MEPKolkata, West Bengal

450 TR Chiller Dismantling & Reinstallation — Peerless Hospital

Dismantling of an old 450 TR chiller and reinstallation of a new Trane Technologies unit at Peerless Hospital, Kolkata — executed without interrupting critical hospital operations.

Client: Peerless Hospital / Trane Technologies

View Case Study
Chiller Machine Shifting — Peerless Hospital
HVAC/MEPKolkata, West Bengal

Chiller Machine Shifting — Peerless Hospital

Internal shifting and repositioning of chiller machines within Peerless Hospital's plant room as part of an HVAC upgrade programme.

Client: Peerless Hospital

View Case Study
Chiller Lifting & Shifting — HDFC Bank, Dalhousie
CommercialDalhousie, Kolkata

Chiller Lifting & Shifting — HDFC Bank, Dalhousie

Lifting and shifting of a chiller machine at HDFC Bank's Dalhousie branch in Kolkata — a heritage area with restricted access and tight working conditions.

Client: HDFC Bank

View Case Study
Kirloskar Chiller Compressor Dismantling — NTT Data Centre
ConstructionKolkata, West Bengal

Kirloskar Chiller Compressor Dismantling — NTT Data Centre

Dismantling and shifting of Kirloskar chiller compressors at NTT's Kolkata data centre — executed with strict protocols to protect adjacent live server infrastructure.

Client: NTT Global Data Centers

View Case Study
Chiller Unloading & Shifting — Coca-Cola Plant, Khurda
IndustrialKhurda, Odisha

Chiller Unloading & Shifting — Coca-Cola Plant, Khurda

Unloading and shifting of chiller machines at Coca-Cola's manufacturing plant in Khurda, Odisha.

Client: Coca-Cola

View Case Study
Chiller Unloading & Shifting — Kishori Hospital
HVAC/MEPBerhampur, Odisha

Chiller Unloading & Shifting — Kishori Hospital

Unloading and shifting of a chiller machine at Kishori Hospital in Berhampur, Odisha — managing the operation in a busy hospital campus.

Client: Kishori Hospital

View Case Study
Chiller Unloading & Shifting — Phulbani, Odisha
HVAC/MEPPhulbani, Odisha

Chiller Unloading & Shifting — Phulbani, Odisha

Unloading and shifting of a chiller machine at a project site in Phulbani, Odisha — a remote hill-town location requiring careful logistics planning.

Client: DB Group

View Case Study
Chiller Installation — Ozone Project, Patna
HVAC/MEPPatna, Bihar

Chiller Installation — Ozone Project, Patna

Unloading and installation of chiller equipment at the Ozone commercial project in Patna, Bihar.

Client: Ozone Group

View Case Study
Crane Unloading & Placement — TATA Projects Site, Assam
ConstructionGuwahati, Assam

Crane Unloading & Placement — TATA Projects Site, Assam

Mobile crane unloading and placement of wrapped plant equipment at a TATA Projects greenfield site in Assam, worked alongside TATA and Johnson Controls site teams.

Client: TATA Projects / Johnson Controls

View Case Study