Our Portfolio

Completed Projects

Explore our portfolio of 500+ successfully completed projects across HVAC, power, construction, and industrial sectors.

510 MVA Transformer Unloading & Foundation Shifting
Power & ElectricalBardwan, West Bengal

510 MVA Transformer Unloading & Foundation Shifting

Unloading and precision shifting of a 510 MVA power transformer to its foundation pad at Satgachi sub-station, Bardwan. One of the heaviest single-piece lifts handled by IPN Lifters.

Client: Larsen & Toubro

View Case Study
Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam
HVAC/MEPAssam

Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam

Unloading and shifting of a Johnson Controls 2700 TR water-cooled chiller at TATA Projects' semiconductor facility in Assam.

Client: TATA Projects / Johnson Controls

View Case Study
50 MVA Transformer Unloading — L&T Jharkhand
Power & ElectricalJharkhand

50 MVA Transformer Unloading — L&T Jharkhand

Unloading and positioning of a 50 MVA power transformer at a new sub-station facility in Jharkhand, executed under L&T's project management.

Client: Larsen & Toubro

View Case Study
Transformer Shifting — Skipper Limited
Power & ElectricalKolkata, West Bengal

Transformer Shifting — Skipper Limited

Internal shifting and repositioning of power transformers at Skipper Limited's Kolkata facility as part of a plant layout reconfiguration.

Client: Skipper Limited

View Case Study
Toshiba Transformer Handling — Kolkata
Power & ElectricalKolkata, West Bengal

Toshiba Transformer Handling — Kolkata

Precision handling and positioning of a Toshiba power transformer at a Kolkata substation project.

Client: Toshiba

View Case Study
450 TR Chiller Dismantling & Reinstallation — RDB Project
HVAC/MEPKolkata, West Bengal

450 TR Chiller Dismantling & Reinstallation — RDB Project

Complete dismantling and reinstallation of a 450 TR chiller machine at an RDB Group commercial project in Kolkata.

Client: RDB Group

View Case Study
450 TR Chiller Dismantling & Reinstallation — Peerless Hospital
HVAC/MEPKolkata, West Bengal

450 TR Chiller Dismantling & Reinstallation — Peerless Hospital

Dismantling of an old 450 TR chiller and reinstallation of a new Trane Technologies unit at Peerless Hospital, Kolkata — executed without interrupting critical hospital operations.

Client: Peerless Hospital / Trane Technologies

View Case Study
Chiller Machine Shifting — Peerless Hospital
HVAC/MEPKolkata, West Bengal

Chiller Machine Shifting — Peerless Hospital

Internal shifting and repositioning of chiller machines within Peerless Hospital's plant room as part of an HVAC upgrade programme.

Client: Peerless Hospital

View Case Study
Chiller Lifting to 45m Height — Peerless Hospital
HVAC/MEPKolkata, West Bengal

Chiller Lifting to 45m Height — Peerless Hospital

Lifting and shifting a chiller machine to the rooftop of Peerless Hospital at 45 metres height with a 20-metre crane radius — one of the most challenging lifts in a hospital environment.

Client: Peerless Hospital

View Case Study
Chiller Lifting & Shifting — HDFC Bank, Dalhousie
CommercialDalhousie, Kolkata

Chiller Lifting & Shifting — HDFC Bank, Dalhousie

Lifting and shifting of a chiller machine at HDFC Bank's Dalhousie branch in Kolkata — a heritage area with restricted access and tight working conditions.

Client: HDFC Bank

View Case Study
Kirloskar Chiller Compressor Dismantling — NTT Data Centre
ConstructionKolkata, West Bengal

Kirloskar Chiller Compressor Dismantling — NTT Data Centre

Dismantling and shifting of Kirloskar chiller compressors at NTT's Kolkata data centre — executed with strict protocols to protect adjacent live server infrastructure.

Client: NTT Global Data Centers

View Case Study
Chiller Unloading & Shifting — Coca-Cola Plant, Khurda
IndustrialKhurda, Odisha

Chiller Unloading & Shifting — Coca-Cola Plant, Khurda

Unloading and shifting of chiller machines at Coca-Cola's manufacturing plant in Khurda, Odisha.

Client: Coca-Cola

View Case Study
Chiller Unloading & Shifting — Kishori Hospital
HVAC/MEPBerhampur, Odisha

Chiller Unloading & Shifting — Kishori Hospital

Unloading and shifting of a chiller machine at Kishori Hospital in Berhampur, Odisha — managing the operation in a busy hospital campus.

Client: Kishori Hospital

View Case Study
Chiller Unloading & Shifting — Phulbani, Odisha
HVAC/MEPPhulbani, Odisha

Chiller Unloading & Shifting — Phulbani, Odisha

Unloading and shifting of a chiller machine at a project site in Phulbani, Odisha — a remote hill-town location requiring careful logistics planning.

Client: DB Group

View Case Study
Chiller Installation — Ozone Project, Patna
HVAC/MEPPatna, Bihar

Chiller Installation — Ozone Project, Patna

Unloading and installation of chiller equipment at the Ozone commercial project in Patna, Bihar.

Client: Ozone Group

View Case Study
900 TR Centrifugal Chiller — MPIN Solar Project
HVAC/MEPEastern India

900 TR Centrifugal Chiller — MPIN Solar Project

Unloading and shifting of a massive 900 TR water-cooled centrifugal chiller by Trane Technologies for the MPIN Solar project — one of the largest single chiller units handled by IPN Lifters.

Client: MPIN Solar / Trane Technologies

View Case Study
210 MVA Transformer — NTPC Farakka
Power & ElectricalFarakka, West Bengal

210 MVA Transformer — NTPC Farakka

Unloading, dragging, and shifting a 210 MVA power transformer to its foundation at NTPC's Farakka thermal power station.

Client: NTPC Limited

View Case Study
TATA Projects — Guwahati Site Operations
ConstructionGuwahati, Assam

TATA Projects — Guwahati Site Operations

Multi-scope heavy equipment handling operations at TATA Projects' major construction site in Guwahati, Assam — including equipment unloading, rigging, and positioning across the project.

Client: TATA Projects

View Case Study