The Challenge
The Toshiba transformer required careful handling due to strict OEM specifications on tilt angles and shock limits during unloading and placement.
Our Approach
The lift plan was prepared as per Toshiba's handling manual. Tilt indicators were monitored throughout the lift. The crane operator executed a controlled single-lift placement with constant communication from ground spotters.
The Result
Transformer placed within OEM-specified tolerances. Toshiba's site engineer confirmed no tilt or shock limit exceedances during the operation.
Project Details
- Client
- Toshiba
- Sector
- Power & Electrical
- Location
- Kolkata, West Bengal
- Duration
- 1 day
Equipment Used
- Hydraulic Crane
- Rollers
- Slings
Project Photos