HVAC/MEP

Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam

Unloading and shifting of a Johnson Controls 2700 TR water-cooled chiller at TATA Projects' semiconductor facility in Assam.

TATA Projects / Johnson Controls
Assam
Completed in 1 day
Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam
Semiconductor facility — cleanroom protocols
Johnson Controls equipment handling
Anti-contamination measures throughout
TATA Projects quality clearance obtained

The Challenge

The semiconductor facility demanded cleanroom-grade handling protocols. Even minor contamination from dust or debris during the chiller installation could compromise the facility's controlled environment.

Our Approach

The chiller was wrapped in protective covers during transport and handling. The installation route was pre-cleaned and dust barriers were erected. The Johnson Controls unit was placed on its foundation using a controlled crane lift with anti-contamination measures throughout.

The Result

Chiller installed with zero contamination incidents. TATA Projects' quality team cleared the installation for integration with the semiconductor facility's cooling system.

Project Details

Client
TATA Projects / Johnson Controls
Sector
HVAC/MEP
Location
Assam
Duration
1 day

Equipment Used

  • Hydraulic Crane
  • Rollers
  • Slings

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam — Photo 1
Johnson Controls 2700 TR Chiller — TATA Semiconductor, Assam — Photo 2