HVAC/MEP

Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam

Unloading, shifting and positioning of Johnson Controls YORK chiller units and DOL starter panels at India's first OSAT semiconductor assembly and test facility, executed under TATA Projects' site management.

Johnson Controls India / TATA Projects
Jagiroad, Morigaon, Assam
Ongoing — commenced 30 July 2026
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam
India's first OSAT semiconductor facility
Johnson Controls YORK units under TATA Projects management
Crane-free positioning — 100T hydraulic jacks and skate system
14-man fully compliant crew — PF, ESIC, police verification
All lifting tackle third-party certified

The Challenge

A semiconductor facility under active construction imposes constraints a conventional industrial site does not. The chiller units had to be moved into position inside a partially completed structure — no crane access to the final placement area, restricted headroom, an unfinished floor surface, and the Assam monsoon running through the deployment window. Site access was shared with multiple concurrent contractors, and the units themselves are high-value OEM equipment where surface damage is not recoverable on site.

Our Approach

IPN LIFTERS mobilised a 14-man crew — every member police-verified, medically cleared and enrolled under PF and ESIC before entering site — alongside a dedicated tools and tackles fleet dispatched under formal road challan. With crane access unavailable at the placement point, the units were skidded into position using 100-tonne hydraulic jacks, hydraulic pumps, 18-tonne cargo trolleys and pipe rollers, running on MS plate track laid over the unfinished floor to distribute load. Chain pulley blocks, 10-tonne belt slings and rated shackles handled controlled movement, and the units remained covered throughout to protect finished surfaces. All lifting tackle carried current third-party inspection certification.

The Result

Chiller units positioned without damage or incident. Work is ongoing at the facility, with IPN LIFTERS retained for the balance of the chiller and starter panel installation scope.

Project Details

Client
Johnson Controls India / TATA Projects
Sector
HVAC/MEP
Location
Jagiroad, Morigaon, Assam
Duration
Ongoing — commenced 30 July 2026

Equipment Used

  • Hydraulic Jacks 100T
  • Hydraulic Pumps
  • Cargo Trolleys 18T
  • Chain Pulley Blocks
  • Belt Slings 10T
  • Pipe Rollers
  • MS Plates
  • Rated Shackles

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam — Photo 1
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam — Photo 2
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam — Photo 3
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam — Photo 4
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam — Photo 5
Johnson Controls YORK Chillers — OSAT Semiconductor Facility, Assam — Photo 6