HVAC/MEP

450 TR Chiller Dismantling & Reinstallation — RDB Project

Complete dismantling and reinstallation of a 450 TR chiller machine at an RDB Group commercial project in Kolkata.

RDB Group
Kolkata, West Bengal
Completed in 2 days
450 TR Chiller Dismantling & Reinstallation — RDB Project
450 TR chiller swapped in a single weekend
Zero occupied-hours downtime
Dismantling + reinstallation combined
Completed for RDB Group on schedule

The Challenge

The existing 450 TR chiller had to be dismantled from the plant room, removed from the building, and a replacement unit reinstalled — all while maintaining cooling for occupied floors on a tight weekend schedule.

Our Approach

The old chiller was systematically disconnected, rigged, and removed through the service access using a combination of chain blocks and hydraulic jacks. The new unit was craned in and positioned on the same day. Piping reconnection and leak testing followed immediately.

The Result

Both the dismantling and reinstallation were completed over a single weekend. The building's HVAC system was back online by Monday morning with zero downtime during working hours.

Project Details

Client
RDB Group
Sector
HVAC/MEP
Location
Kolkata, West Bengal
Duration
2 days

Equipment Used

  • Hydraulic Crane
  • Chain Pulley Block
  • Hydraulic Jacks
  • Slings

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

450 TR Chiller Dismantling & Reinstallation — RDB Project — Photo 1
450 TR Chiller Dismantling & Reinstallation — RDB Project — Photo 2
450 TR Chiller Dismantling & Reinstallation — RDB Project — Photo 3