Chiller Lifting to 45m Height — Peerless Hospital

Lifting and shifting a chiller machine to the rooftop of Peerless Hospital at 45 metres height with a 20-metre crane radius — one of the most challenging lifts in a hospital environment.

Peerless Hospital
Kolkata, West Bengal
Completed in 1 day
Chiller Lifting to 45m Height — Peerless Hospital
45-metre lift height with 20m radius
Adjacent to fully occupied hospital
Single-lift precision placement
Early morning execution for safety

The Challenge

The chiller had to be lifted to the 45-metre-high rooftop with a 20-metre radius — pushing the crane's capacity envelope. The lift was adjacent to an occupied hospital building with patients, staff, and ambulance access that could not be blocked.

Our Approach

A detailed crane study was carried out to confirm load charts at 45m height and 20m radius. An exclusion zone was established on the ground level. The lift was executed during early morning hours to minimise wind load and building occupancy. Continuous communication between the crane operator, rigger, and rooftop team ensured precision placement.

The Result

The chiller was successfully lifted and placed on the rooftop in a single lift operation. No damage, no disruption to hospital access, and the entire operation was completed within the early morning window.

Project Details

Client
Peerless Hospital
Sector
HVAC/MEP
Location
Kolkata, West Bengal
Duration
1 day

Equipment Used

  • Hydraulic Mobile Crane 100T
  • Wire Rope Slings
  • Spreader Bar

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

Chiller Lifting to 45m Height — Peerless Hospital — Photo 1
Chiller Lifting to 45m Height — Peerless Hospital — Photo 2
Chiller Lifting to 45m Height — Peerless Hospital — Photo 3