Power & Electrical

210 MVA Transformer — NTPC Farakka

Unloading, dragging, and shifting a 210 MVA power transformer to its foundation at NTPC's Farakka thermal power station.

NTPC Limited
Farakka, West Bengal
Completed in 4 days
210 MVA Transformer — NTPC Farakka
210 MVA transformer for national thermal grid
200m dragging through live plant infrastructure
Full NTPC HSE compliance
Zero-incident completion

The Challenge

The 210 MVA transformer had to be moved from the rail siding to the transformer bay inside the NTPC plant — a distance of over 200 metres through existing plant infrastructure. NTPC's strict safety protocols and confined working spaces added complexity.

Our Approach

Coordinated with NTPC's safety and operations teams to plan a phased dragging and shifting operation. The unit was first unloaded onto a roller track using hydraulic jacks, then carefully dragged along a prepared route to the foundation. Continuous monitoring ensured no deviation from the planned path.

The Result

The transformer was successfully placed on its foundation pad, aligned to NTPC's specifications. The operation was completed safely with full compliance to NTPC's HSE requirements.

Project Details

Client
NTPC Limited
Sector
Power & Electrical
Location
Farakka, West Bengal
Duration
4 days

Equipment Used

  • Hydraulic Crane
  • Pipe Rollers
  • Wire Rope Slings
  • Chain Pulley Block

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

210 MVA Transformer — NTPC Farakka — Photo 1
210 MVA Transformer — NTPC Farakka — Photo 2