HVAC/MEP
Chiller Unloading & Shifting — Kishori Hospital
Unloading and shifting of a chiller machine at Kishori Hospital in Berhampur, Odisha — managing the operation in a busy hospital campus.
Kishori Hospital
Berhampur, Odisha
Completed in 1 day

Hospital campus environment managed
Ambulance access maintained throughout
Early morning execution
Single-lift placement
The Challenge
The hospital campus had limited space for crane setup and the chiller had to be placed in a plant area accessible only through the main campus road, which is used by ambulances and patients.
Our Approach
The lift was scheduled during early morning to minimise patient and ambulance traffic. A compact crane setup was used, and spotters managed pedestrian movement around the work zone. The chiller was placed directly on its foundation pad in a single lift.
The Result
Chiller installed successfully with no disruption to hospital emergency access. The operation was completed before peak hospital hours.
Project Details
- Client
- Kishori Hospital
- Sector
- HVAC/MEP
- Location
- Berhampur, Odisha
- Duration
- 1 day
Equipment Used
- Hydraulic Crane
- Chain Pulley Block
- Slings