HVAC/MEP

Chiller Machine Shifting — Peerless Hospital

Internal shifting and repositioning of chiller machines within Peerless Hospital's plant room as part of an HVAC upgrade programme.

Peerless Hospital
Kolkata, West Bengal
Completed in 1 day
Chiller Machine Shifting — Peerless Hospital
Confined plant room manoeuvring
Operational hospital environment
Load spreading for floor protection
Zero damage to existing equipment

The Challenge

Chillers needed to be repositioned within a confined plant room while other HVAC equipment remained in operation. Floor loading capacity and doorway dimensions constrained the movement options.

Our Approach

Each chiller was jacked, placed on rollers, and carefully repositioned along a pre-planned path that maintained clearances from operating equipment. Load spreading plates were used where floor loading was a concern.

The Result

All chillers repositioned as per the new plant room layout. No damage to existing equipment or building structure. Hospital operations continued uninterrupted.

Project Details

Client
Peerless Hospital
Sector
HVAC/MEP
Location
Kolkata, West Bengal
Duration
1 day

Equipment Used

  • Hydraulic Jacks
  • Pipe Rollers
  • Chain Pulley Block

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

Chiller Machine Shifting — Peerless Hospital — Photo 1
Chiller Machine Shifting — Peerless Hospital — Photo 2