HVAC/MEP
Chiller Machine Shifting — Peerless Hospital
Internal shifting and repositioning of chiller machines within Peerless Hospital's plant room as part of an HVAC upgrade programme.
Peerless Hospital
Kolkata, West Bengal
Completed in 1 day

Confined plant room manoeuvring
Operational hospital environment
Load spreading for floor protection
Zero damage to existing equipment
The Challenge
Chillers needed to be repositioned within a confined plant room while other HVAC equipment remained in operation. Floor loading capacity and doorway dimensions constrained the movement options.
Our Approach
Each chiller was jacked, placed on rollers, and carefully repositioned along a pre-planned path that maintained clearances from operating equipment. Load spreading plates were used where floor loading was a concern.
The Result
All chillers repositioned as per the new plant room layout. No damage to existing equipment or building structure. Hospital operations continued uninterrupted.
Project Details
- Client
- Peerless Hospital
- Sector
- HVAC/MEP
- Location
- Kolkata, West Bengal
- Duration
- 1 day
Equipment Used
- Hydraulic Jacks
- Pipe Rollers
- Chain Pulley Block
Project Photos