Unloading and shifting of a chiller machine at a project site in Phulbani, Odisha — a remote hill-town location requiring careful logistics planning.

DB Group
Phulbani, Odisha
Completed in 3 days
Chiller Unloading & Shifting — Phulbani, Odisha
Remote hill-town location
2-day equipment mobilisation
Uneven terrain management
Delivered on schedule despite challenges

The Challenge

Phulbani is a remote hill-town in Odisha's Kandhamal district with winding mountain roads. Transporting the crane and rigging equipment to the site was itself a logistical challenge, followed by the chiller installation on uneven terrain.

Our Approach

Equipment was mobilised from Bhubaneswar over a 2-day road journey. The crane was set up on levelled ground near the installation point. The chiller was unloaded and shifted to its foundation using a combination of crane lift and manual rigging.

The Result

Chiller successfully installed despite the remote and challenging terrain. The project was delivered on schedule, demonstrating IPN Lifters' ability to operate in difficult-access locations across Eastern India.

Project Details

Client
DB Group
Sector
HVAC/MEP
Location
Phulbani, Odisha
Duration
3 days

Equipment Used

  • Hydraulic Crane
  • Chain Pulley Block
  • Slings

Similar Project?

Get a Quote for Your Site

Request a QuoteTalk to Our Team

Project Photos

Chiller Unloading & Shifting — Phulbani, Odisha — Photo 1
Chiller Unloading & Shifting — Phulbani, Odisha — Photo 2