Transformer Unloading & Site Shifting

Unloading, dragging and foundation placement of power transformers from 50 MVA to 510 MVA — including movement through live substations and plant infrastructure.

Transformer Unloading & Site Shifting

Overview

IPN LIFTERS handles power transformers from 50 MVA distribution units up to 510 MVA grid-class machines — among the heaviest single-piece loads moved in Eastern India. Our crews unload transformers from multi-axle trailers and rail sidings, then drag and shift them along prepared roller tracks to their foundation bays — including routes that pass through live electrical installations, narrow substation corridors and operating plant infrastructure. We work to the OEM's handling instructions and have executed transformer operations for L&T, NTPC, Toshiba and Skipper. Jacking, packing and roller-track inching bring each unit to its final position on the foundation pad.

How We Deliver It

01

Method Statement

Prepare a detailed method statement with the client's project team covering route, clearances and shutdown windows

02

Unloading

Unload from trailer or rail siding using cranes or hydraulic jacking onto a prepared roller track

03

Dragging & Shifting

Inch the transformer along the surveyed route with jacks and pipe rollers, monitoring clearances from live equipment

04

Foundation Positioning

Final alignment on the foundation pad with millimetre-level accuracy, to OEM tilt and shock tolerances

Equipment Used

  • Hydraulic Cranes
  • Hydraulic Jacks
  • Pipe Rollers & Roller Tracks
  • Wire Rope Slings & Winches

Sectors Served

Power & ElectricalUtilities & GridIndustrial PlantsEPC Projects

Need this service?