Dismantling & Reinstallation Services

Dismantling old equipment and installing replacements — including complete chiller swaps over a single weekend in running buildings and hospitals.

Dismantling & Reinstallation Services

Overview

When a chiller or transformer reaches end of life, the replacement job is twice the work: the old unit must come out before the new one goes in — usually through the same narrow route, and usually while the building keeps running. IPN LIFTERS manages the complete cycle: systematic disconnection, sectioning oversized units for removal through restricted openings, rigging out the old equipment, and craning in and positioning the replacement. We have swapped 450 TR chillers over a single weekend so occupied floors never lost cooling during working hours, and executed hospital plant-room replacements on night shifts with acoustic barriers and infection-control compliance. Minimal downtime is not a promise — it's the plan.

How We Deliver It

01

Pre-Dismantling Survey

Document the existing setup, removal route and sequence; plan sectioning if needed

02

Safe Dismantling

Systematic disconnection and rigging out of the old unit with proper labelling

03

New Unit Installation

Crane in and position the replacement, often within the same shutdown window

04

Alignment & Handover

Final alignment and handover for reconnection, testing and commissioning

Equipment Used

  • Hydraulic Cranes
  • Chain Pulley Blocks
  • Hydraulic Jacks
  • Rigging Gear

Sectors Served

Hospitals & HealthcareCommercial BuildingsIndustrial PlantsPower & Electrical